Sinking a Sewer Line
The design and construction of a sanitary sewer siphon using high density polyethylene (HDPE) pipe in San Juan, Puerto Rico, provided Black & Veatch with a challenging opportunity...

Easing the Way for E-Permitting
In an effort to speed the development of an electronic permitting process in Fairfax County, Virginia, the firm Dewberry & Davis conducted a forum as part of a kickoff process....

Building Code Requirements for Masonry Structures (ACI 530-99/ ASCE 5-99/TMS 402-99), Specification for Masonry Structures (ACI 530.1-99/ ASCE 6-99/TMS 602-99), Commentary on Building Code Requirements for Masonry Structures, Commentary on Specification for Masonry Structures
Building Code Requirements for Masonry Structures (ACI 530-99/ASCE 5-99/TMS 402-99), Specification for Masonry Structures (ACI 530.1-99/ASCE 6-99/TMS 602-99), Commentary on Building Code...

Toronto's Tunnel Solution (Available in the Geoenvironmental Special Section only)
The Toronto Transit Commission (TTC), one of the largest public transportation systems in North America, carries more than 1,000,000 commuters a day. The TTC's tunnels had...

Saving the Williamsburg Bridge
The Williamsburg Bridge, which has connected Brooklyn to Manhattan for more than 97 years, is midway through an ambitious 14-year, $800-million reconstruction that will save the venerable...

Rapid Expansion
Dallas Area Rapid Transit (DART) is undertaking an ambitious light-rail expansion program. It already operates a 20 mi (32 km) light-rail starter system in the city of Dallas. Under construction...

Safeguarding Los Alamos
A forest fire that burned 48,000 ac (19,500 ha) around the Los Alamos National Laboratory, in New Mexico, in May 2000, created another problem for one of the nation's most...

Blocking the Tide
The city of Venice is in peril as a result of increased tidal flooding, and a proposed system of movable gates offers the greatest promise of safeguarding the city's future....

Examining the Capitol Dome
The dome of the United States Capitol, designed and built from the 1850s to the 1860s, is a masterpiece of 19th-century engineering and construction. The majority of the dome is made of...

Quality in the Constructed Project
A Guide for Owners, Designers, and Constructors
This Second Edition of Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors (ASCE Manual No. 73) provides information...

Golden Gate Update
A comprehensive seismic retrofit is under way to ensure that San Francisco's 2.74-km-long Golden Gate Bridge will remain in operation even after a maximum credible earthquake...

Evaluation of KeySystem I Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Innovation Center. This report describes an evaluation to determine...

Emerging Materials for Civil Infrastructure
State of the Art
Prepared by the Emerging Materials Committee of the Materials Division of ASCE. This report presents a review of the state of the art on emerging materials...

In Plain View
(Available only in Special Structural Issue) A structural engineer's work is typically hidden beneath layers of concrete and plaster, but the Pittsburgh Civic Center in the...

Foundation Design for the Elevated Station
The Amundsen-Scott South Pole Station is located at an elevation of 2,850 m on the 3,200 m thick polar plateau, a field of ice and snow that is moving toward the ocean at a rate of 10...

The Construction Challenges
The varied SPRP construction and construction management complexities of the new South Pole are even more challenging because summer work must be carried out within a compressed window...

Phase II Evaluation Findings
The Segmental Concrete Channel Bridge System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF Innovation Center. This report represents the second component of the...

Battling Concrete Corrosion
For decades engineers have fought concrete corrosion, but few methods have offered a long-term solution�until now. Electrochemical techniques such as electrochemical chloride extraction...

Best of Both Worlds
All around the Pacific Rim structural engineers are experimenting with concrete filled steel tubes as structural elements. The concrete filled tubes take advantage of the best properties...

Rebuilding a Railroad Bridge
The Peck Movable Bridge and Bridgeport Viaduct is a four-track crossing in Connecticut that serves three rail lines. The 1904 bridge had deteriorated, causing a kink that forced trains...

 

 

 

 

Return to search